Client Info

Client:
Tamworth Regional Council
Share Project:

Project Details

McCarthy Group recently undertook the construction of approx. 800m2 of concrete footpath work, 2 sets of refuge island crossings on part of connecting a Skatepark for Tamworth Regional Council. The scope of works for these includes:

• Setup and control of Traffic Management on TfNSW Road to allow for construction works
• Construction of 10 Refuge Islands
• 270m of Shared Path Construction
• Additional 1.5m Paths, Pram Ramps and Kerb Restoration
• Linemarking of refuge island and Kerb Restoration
• Topsoiling, revegetation of surrounding ground to match the path design